-
Annealing Simulator run out table (ROT) with process control sensors
Last Submission Date: July 26, 2019
-
Magnetostrictive Sensing (MsS) Prototype Device for Pipe inspection.
Last Submission Date: July 25, 2019
-
DESIGN, SUPPLY, INSTALLATION & COMMISSIONING OF PLANT LIGHTING SYSTEM AT 50MW RAMAGUNDAM SOLAR PV PLANT, TELANGANA
Last Submission Date: July 25, 2019
-
Expression of Interest (EoI) for Technology Tie-up for Valves for Nuclear Power Plant
Last Submission Date: July 17, 2019
-
Expression of Interest for Technology Tie-up for Ash Handling System
Last Submission Date: July 17, 2019
-
Supply and I&C of module cleaning system for 129 MW solar PV power plant for SCCL.
Last Submission Date: July 03, 2019
-
Supply of auxiliary, control and communication cables for 129 MW SCCL 50mw Ramagundam, 39 mw Yellandu and 30 MW Manuguru projects.
Last Submission Date: July 01, 2019
-
Detailed Design, Detailed Engineering, Prototype, Manufacture, Supply, Delivery & Storage at site, Installation, Testing & Commissioning (Including Integrated Testing & Commissioning), Training of Personnel, Demonstration of Performance of System/Equipment, Annual Maintenance Contract of Lift & Escalator System (L & E) of Four Underground Stations for the Kolkata Metro East-West Line Project (Phase-II): UG/L & E-II.
Last Submission Date: June 27, 2019
-
Supply of Balance of System items, HT switchyard, Overhead Transmission line, I&C for Indian Railways grid connected 1.7 MW Solar PV plant at Sukhi Sewai Bhopal MP
Last Submission Date: June 25, 2019
-
SS316 fasteners for PV module for 129 MW Solar PV power plant for SCCL (4 sites). (E-tender)
Last Submission Date: June 24, 2019
-
Supply of M16x50 SS304 fasteners with bush for 129 MW Solar PV power plant for SCCL (4 sites).
Last Submission Date: June 17, 2019
-
1.1KV 1CX400 sqmm DC Cables for SCCL 129MW SPV Project at Telangana
Last Submission Date: May 30, 2019
-
MMS Superstructures for 1.7MW Solar PV Plant at Sukhi Swaniya, Indian Railway at Bhopal (E-tender)
Last Submission Date: May 30, 2019
-
Supply of 1Cx300 sqmm 33 kV(E) AL XLPE Armd for 129 MW SPV Project, SCCL Telangana (4 sites)
Last Submission Date: May 28, 2019
-
Supply, I&C and O&M for BOS and Transmission line of for 10 MW SPV Project, STPP, Pegadapally, SCCL Telangana
Last Submission Date: May 28, 2019
-
Purchase of Instrumented Aircraft System for Atmospheric Research &Maintenance–Qty. 01 System
Last Submission Date: May 24, 2019
-
1250KW PCUs for 129 MW SCCL Solar Photo Voltaic Power Project at Telangana
Last Submission Date: May 24, 2019
-
3kVA UPS with batteries for 129MW Solar PV Plant at SCCL, Telangana.
Last Submission Date: May 24, 2019
-
SUPPLY OF CABLE GLANDS AND LUGS FOR GACL 20 MW SOLAR PROJECT
Last Submission Date: May 14, 2019
-
Technology Tie-up for Dry Bottom Ash Handling System
Last Submission Date: April 22, 2019
-
DESIGN, SUPPLY, INSTALLATION COMMISSIONING AND OPERATION MAINTENANCE OF 132kV SWITCH YARDS WITH TRANSMISSION LINES FOR SCCL GRID-CONNECTED SPV PLANT IN TELANGANA STATE AT MANUGURU 30MW PLANT
Last Submission Date: April 22, 2019
-
INVITATION OF BIDS FOR SUPPLY OF 3,61,020 QUANTITY OF GRENADE 30MM VOG-17 FOR AGS-17/AGL-30
Last Submission Date: April 12, 2019
-
Supply and Installation of High-Pressure Gas Adsorption Isotherm System
Last Submission Date: April 12, 2019
-
DESIGN AND SUPPLY OF COMPLETE FLOATATION PLATFORM AND ACCESSORIES WITH MOORING AND ANCHORING OF THIS PLATFORM FOR 5MW GRID CONECTED FLOATING SOLAR PHOTOVOLTAIC POWER PLANT ON RAW WATER POND NO 3 IN
Last Submission Date: April 12, 2019
-
DESIGN, SUPPLY, INSTALLATION, INTEGRATION, TESTING AND COMMISSIONING OF LATEST RELEASE DIGITAL OPEN STANDARD APCO PHASE-II SYSTEM"
Last Submission Date: April 05, 2019
-
INVITATION OF BIDS FOR SUPPLY OF NON LINEAR JUNCTION DETECTOR QTY-376 NOS.
Last Submission Date: March 29, 2019
-
INVITATION OF BIDS FOR SUPPLY OF SPARES FOR ZIL VEHICLE
Last Submission Date: March 15, 2019
-
INVITATION OF BIDS FOR SUPPLY OF SPARES FOR KRAZ VEHICLE
Last Submission Date: March 15, 2019
-
Supply and Installation ofFTIR Spectrophotometer(with DRIFTS attachments) with high pressure, high temperature reactor setup
Last Submission Date: March 15, 2019
-
Supply and Installation ofWhole Core Steady-State GasPermeameter
Last Submission Date: March 15, 2019